The rehabilitation of the steam turbines of the coal power plants in Yeniköy and Kemerköy, owned by İçtaş and Limak, under the leadership of GE.
Mechanical installation of the paper manufacturing plant 5 of Modern Karton in Çorlu.
Mechanical works of the Istanbul EfW (Energy from Waste) plant. The engineering solution of the project was undertaken by Hitachi Zosen Inova.
Engineering, procurement, construction and commissioning assistance of the Air Liquide’s air separation plant in the site of Petkim.
Installation of water treatment plant in the metal recovery facility of Marzinc with the engineering support of Brofind. After successfully completing its scope, Teknokon supports the commissioning of the plant.
Teknokon performed the installation of the gas storage tank and system with the capacity of 65.000 m3 at Isdemir plants in Iskenderun.
Installation and commissioning assistance works of the starch dryer unit at the Orhangazi plants of Cargill.
PFHE, which can be considered as a continuation of the Installation of Central Waste Heat Recovery Boiler (CWHRB), covers civil, mechanical, electrical and instrumentation works.
Manufacturing of the site storage tanks and installation of the entire plant of corn wet mill of Amylum in Adana
DBN, which can be considered as a continuation of the Installation of Central Waste Heat Recovery Boiler (CWHRB), covers civil, mechanical, electrical and instrumentation works.
The nickel refinery project is one of the most comprehensive projects in the mining sector in Turkey over the last few years. Teknokon served as the main construction and mechanics contractor in the Meta Nickel Refinery Project and undertook the procurement, manufacturing and installation of all the site tanks and all piping, civil works, structural steel installation works, insulation, and scaffolding services. Teknokon also provided commissioning and maintenance services.
Installation and commissioning works of the starch dryer unit at the Orhangazi plants of Cargill.
Installation of the leach and ammoniac plants of Eti Bakır in Mazıdağı, Mardin.
Replacement of High-Pressure Steam Lines, which can be considered as a continuation of the Installation of Central Waste Heat Recovery Boiler (CWHRB).
All mechanical works and commissioning of the acid and smelting plant of Eti Bakır in Samsun.
The PSA-2 unit, which can be considered as a continuation of the Installation of Central Waste Heat Recovery Boiler (CWHRB), includes mechanical, electrical and instrumentation works
Engineering, procurement, construction and commissioning assistance of the air separation plant of Air Liquide in Polatlı / Ankara.
Mechanical installation and piping works of the wet mill unit, pipe bridges and oil refinery of Cargill in Efremov / Russia. Teknokon also provided maintenance services for the plant.
Construction, mechanics and E&I works of the Isdemir’s air separation unit no. 8 with the process support of Linde.
Linde, a technology company based in Germany, is the Employer of the project. This is Teknokon’s first project within the MOL Refinery in Tiszaújváros, Hungary.
Teknokon completed the plant boilers and BOP piping of the 600 MW NG CCPP - Unit 2 in Bandırma under the leadership of Siemens.
Construction and mechanical works of the conversion of the Ataş Refinery to a storage terminal were completed under the leadership of Foster Wheeler. Teknokon performed the pre-production and installation of 1,200 tons of pipes for this project.
Installation of the HRSG boilers, gas and steam turbine systems, generators, BOP piping and the auxiliary systems was completed under the leadership Metka in Samsun Turkey.
The 3rd phase of oil loading terminal of Tüpraş in İzmir refinery is carried out by Teknokon on a turnkey basis.
Teknokon performed the installation of the boilers, BOP piping, and commissioning of the 950 MW NG CCPP of ACWA Energy Group in Kırıkkale under the EPC leadership of Samsung.
Teknokon proje kapsamında mühendislik, satın alma, inşaat, mekanik, elektrik ve enstrüman işlerini yapmaktadır.
Engineering, procurement, construction and commissioning of the petroleum filling and storage terminal of PCE Denmark in Batumi, Georgia. The terminal has the capacity of receiving and storing of 70 m3 / hour and 10 million tons / year HFO / LFO.
Engineering, procurement, construction and commissioning of the project of tanker filling and storage plant of Petrol Ofisi in Trabzon.
Teknokon performed pre-production of the BOP and auxiliary piping, the installation of the HRSG boilers and the BOP piping, and the commissioning operations of the 840 MW NG CCPP of Gama Group in Kırıkkale under the EPC leadership of Gama Güç Sistemleri.
In order to increase the efficiency of LPG Merox unit in Tüpraş Aliağa Refinery, partial production and renovation is carried out by Teknokon on a turnkey basis.
Teknokon performed the installation, piping, and commissioning works of the HRSG boilers of the power plant of RWE in Denizli.
Procurement and installation of the loading arms and the piping of the port and the terminal were completed at Opet terminal in Marmara Ereğlisi.
Foster Wheeler, TR ve Alarko Konsorsiyumu liderliğinde proses ve yardımcı sistemlere ait 1,800 ton borulama işi gerçekleştirilmiştir.
Teknokon carried out the installation of the HRSG boilers, gas and steam turbine systems, BOP pipings and the auxiliary systems of 400 MW CCPP of OGK / E.ON Group in Shatura, Russia under the leadership of GE – Gama EPC consortium.
Engineering, procurement, construction and commissioning of the GSIP unit project at the Aliağa Refinery of Tüpraş.
Teknokon carried out the installation of the HRSG boilers, gas and steam turbine systems, BOP pipings and the auxiliary systems of 800 MW CCPP of OGK / E.ON Group in Surgut, Russia under the leadership of GE – Gama EPC consortium.
Teknokon performed all the mechanical scope of the Tereshkova plant of Zorlu Enerji in Moscow, Russia under the EPC leadership of ZENEN.
Teknokon performed the installation of the HRSG boilers and BOP piping, and the commissioning operations of the 600 MW natural gas cycle plant of Cengiz Enerji in Samsun under the EPC leadership of Cengiz Enerji.
Teknokon has become the first Turkish contractor to work in Cuba with the sulphuric acid plant project in Moa, Cuba. Process equipments erection, piping, and structural steel erection were completed by Teknokon.
Engineering, procurement, construction and commissioning of tanker and train loading & unloading and storage terminal in the İzmit Refinery of Tüpraş.
Tank erection, painting and rubber lining of the gold mine sulfide expansion project brought into action by Anagold with Amec Foster Wheeler process design in İliç, Erzincan.
Tank erection, painting and rubber lining of the gold mine sulfide expansion project brought into action by Anagold with Amec Foster Wheeler process design in İliç, Erzincan.
Mechanical installation of the air separation unit of Air Liquide in Nizhniy Novgorod, Russia.
Engineering, procurement, construction and commissioning assistance of Isdemir’s air separation plant no. 7 supplied by Erenko.