GAMA 840 MW CCPP
Teknokon performed pre-production of the BOP and auxiliary piping, the installation of the HRSG boilers and the BOP piping, and the commissioning operations of the 840 MW NG CCPP of Gama Group in Kırıkkale under the EPC leadership of Gama Güç Sistemleri.
Client: GAMA
Location: Kırıkkale / Turkey
Status: Completed
Detailed Scope of Works
Fabrication: 48,000 WDI BOP piping (Including P91, P22, P11 equipments)
Equipment Installation: 8,690 tons of Doosan HRSG
Piping Erection: 27,000 WDI (Including P91, P22, P11 equipments)