Installation of Central Waste Heat Recovery Boiler (CWHRB)
Linde, a technology company based in Germany, is the Employer of the project. This is Teknokon’s first project within the MOL Refinery in Tiszaújváros, Hungary. In 2019, the contract was signed. It is a multi-disciplinary project covering Civil, Mechanical, Electrical and Instrumentation works.
Customer: Linde Engineering
Location: Tiszaújváros / Hungary
Status: Completed
Detailed Scope of the Works
Scopes of Manufacturing: Pipe Spooling Fabrication and Structural Steel Elements
Construction Works: Excavation works, Piling, Various Pump, Steel and Equipment Foundations, Backfill Works, Site Concrete and Infrastructure Works
Structural Steel Installation: All Structural Steel Installation, Pipe Bridges Erection
Pipe Installation: All Process and Auxiliary Piping Works
Insulation and Painting Works: Piping and Equipment Insulation Works and Structural Steel Painting Works
Electricity & Instrumentation: All Electrical & Instrumentation works