PSA-1 and PSA-2 Units


The PSA1-2 units, which can be considered as a continuation of the Installation of Central Waste Heat Recovery Boiler (CWHRB), includes mechanical, electrical and instrumentation works. The construction phase of the Early Works has been completed.
 
Customer: Mol Group
Location: Tiszaújváros / Hungary
Status: Completed
 

Detailed Scope of the Works


Scopes of Manufacturing: Pipe Spooling Fabrication and Structural Steel Elements
Construction Works: Excavation works, Piling, Various Pump, Steel and Equipment Foundations, Backfill Works, Site Concrete and Infrastructure Works
Structural Steel Installation: All Structural Steel Installation, Pipe Bridges Erection
Pipe Installation: All Process and Auxiliary Piping Works
Insulation and Painting Works: Piping and Equipment Insulation Works and Structural Steel Painting Works
Electricity & Instrumentation: All Electrical & Instrumentation works