OMV 880 MW CCPP
Installation of the HRSG boilers, gas and steam turbine systems, generators, BOP piping and the auxiliary systems was completed under the leadership Metka in Samsun Turkey.
Client: METKA
Location: Samsun / Turkey
Status: Completed
Detailed Scope of Works
Structural Steel Erection: 1,820 tons
Equipment Installation: 2 Doosan HRSGs and stacks, 2 GE 9FB gas turbines, 2 hydrojen cooled generators, 2 GE heavy-duty steam turbines, BOP equipments
Piping Erection: 25,000 WDI (Including P91, P22, P11 equipments)